| 18 July 2025 |
|
Rapair work Scope of work was to carry out repairs and put the unit back into operation in line with its original design specifications |
| Sri Lanka | |||
| HPP Branford (Vertical Kaplan turbine) | |||
|
Activities: – Rapair work |
|||
| Number of units | Total output (kW) | Head of water (m) | Flow (m3/s) |
| 1 | 1420 | 5,5 | 27,7 |
<div class="card" id="hvac">
<h3>HVAC SYSTEMS</h3>
<ul>
<li>Per position of the heat source</li>
<li>Per energy source used to produce thermal energy (type of fuel)</li>
<li>Per heat carrier</li>
<li>Per method of heat dissipation of heating elements</li>
</ul>
</div>