HPP Suba – Kolumbija

BY: admin COMMENTS (0) July 28, 2025
17 april 2025

Sklapanje radnog kola

Obim radova obuhvata ponovno sklapanje novog distributora, precizno poravnanje generatora i ugradnju novog radnog kola turbine.
(www.gugler.com)

Kolumbija
HE Suba (Horizontalna Francis turbina)

Aktivnosti: – Terenski pregled (inspekcija na lokaciji)

Broj jedinica 

Ukupna snaga (kW) 

Radna visina (m) 

Protok (m³/s) 

1 2645 42,36 -52,2 5,65

Copyright © 2025 Fluid Power. All rights reserved. © Powered by apollobranders

<div class="card" id="hvac">
<h3>HVAC SYSTEMS</h3>
<ul>
<li>Per position of the heat source</li>
<li>Per energy source used to produce thermal energy (type of fuel)</li>
<li>Per heat carrier</li>
<li>Per method of heat dissipation of heating elements</li>
</ul>
</div>