| 23 April 2025 |
|
Site inspection work The scope of the assessment is site inspection of running units end defining requirements for further investment for putting units to their designed specifications |
| Chile | |||
| HPP El Toro (Vertical Pelton turbine) | |||
|
Activities: – Site inspection work |
|||
| Number of units | Total output (kW) | Head of water (m) | Flow (m3/s) |
| 1 | 1180 | 177,2 | 0,75 |
<div class="card" id="hvac">
<h3>HVAC SYSTEMS</h3>
<ul>
<li>Per position of the heat source</li>
<li>Per energy source used to produce thermal energy (type of fuel)</li>
<li>Per heat carrier</li>
<li>Per method of heat dissipation of heating elements</li>
</ul>
</div>