| 17 April 2025 |
|
Runner assembly The scope of work includes the reassembly of the new distributor, precise alignment of the generator, and installation of the new turbine runner.” (www.gugler.com) |
| Colombia | |||
| HPP Suba (Horizontal Francis turbine) | |||
| Activities: – Site inspection work | |||
| Number of units | Total output (kW) | Head of water (m) | Flow (m3/s) |
| 1 | 2645 | 42,36 -52,2 | 5,65 |
<div class="card" id="hvac">
<h3>HVAC SYSTEMS</h3>
<ul>
<li>Per position of the heat source</li>
<li>Per energy source used to produce thermal energy (type of fuel)</li>
<li>Per heat carrier</li>
<li>Per method of heat dissipation of heating elements</li>
</ul>
</div>