HPP Alejandria 2 – Colombia

BY: admin COMMENTS (0) July 11, 2025
15 November 2024
Maintenenace activities of vertical Kaplan unit with gearbox (www.gugler.com)
Colombia
HPP Alejandria II (Vertical Kaplan turbine)
Activities: – Maintenenace activities
Number of units Total output (kW) Head of water (m) Flow (m3/s)
1 2148 14,76 16,0

Copyright © 2025 Fluid Power. All rights reserved. © Powered by apollobranders

<div class="card" id="hvac">
<h3>HVAC SYSTEMS</h3>
<ul>
<li>Per position of the heat source</li>
<li>Per energy source used to produce thermal energy (type of fuel)</li>
<li>Per heat carrier</li>
<li>Per method of heat dissipation of heating elements</li>
</ul>
</div>